When it is better to estimate a slope with only one point. - Inserm - Institut national de la santé et de la recherche médicale Access content directly
Journal Articles QJM Year : 2008

When it is better to estimate a slope with only one point.

Abstract

When investigating the change in a biomarker, it is often believed that at least two measurements are needed from each participant, and that those with only one measurement should be excluded. In this short note, we explain why this could lead to imprecise and biased estimates. Furthermore, we discuss a standard statistical method that handles such issues.
Fichier principal
Vignette du fichier
ms-ftQJMR1.pdf (140.83 Ko) Télécharger le fichier
Figure_1R1.pdf (54.56 Ko) Télécharger le fichier
Table_1R1.pdf (51.87 Ko) Télécharger le fichier
inserm-00336900_edited.pdf (135.77 Ko) Télécharger le fichier
Origin : Files produced by the author(s)
Origin : Files produced by the author(s)
Origin : Files produced by the author(s)
Origin : Files produced by the author(s)

Dates and versions

inserm-00336900 , version 1 (04-08-2009)

Identifiers

Cite

Thiebaut Rodolphe, Sarah Walker. When it is better to estimate a slope with only one point.. QJM, 2008, 101 (10), pp.821-4. ⟨10.1093/qjmed/hcn099⟩. ⟨inserm-00336900⟩

Collections

INSERM
53 View
376 Download

Altmetric

Share

Gmail Facebook X LinkedIn More